Resources development and the non-built physical environment of the Upper Hunter Valley N.S.W. /

Gorde:
Xehetasun bibliografikoak
Egile nagusia: Day, Diana G. (Diana Gwendoline), 1950-
Erakunde egilea: Australian National University. Centre for Resource and Environmental Studies
Formatua: Liburua
Hizkuntza:English
Argitaratua: [Canberra] : Centre for Resource and Environmental Studies, Australian National University, [1982].
Saila:CRES working paper ; CP/WP5(82)
Gaiak:
LEADER 01410nam a2200301 c 4500
001 c000150818
003 CARM
005 00000000000000.0
008 821105s1982 at b b 00010 eng d
019 1 |a 2332343  |z 46250617  |5 LACONCORD2021 
020 |a 0867400218 :  |c price unknown 
035 |a (OCoLC)27597902  |5 LACONCORD2021 
042 |a anuc 
043 |a u-at-ne 
100 1 |a Day, Diana G.  |q (Diana Gwendoline),  |d 1950- 
245 1 0 |a Resources development and the non-built physical environment of the Upper Hunter Valley N.S.W. /  |c Diana Day. 
260 |a [Canberra] :  |b Centre for Resource and Environmental Studies, Australian National University,  |c [1982]. 
300 |a 17 p. :  |b map ;  |c 30 cm. 
440 0 |a CRES working paper ;  |v CP/WP5(82) 
500 |a Industrial development. Environmental aspects. New South Wales. Upper Hunter Valley (ANB/PRECIS SIN 0635375) 
504 |a Bibliography: p. 17. 
650 0 |a Factories  |x Environmental aspects  |z New South Wales  |z Hunter River Valley. 
651 0 |a Hunter River Valley (N.S.W.)  |x Industries. 
710 2 0 |a Australian National University.  |b Centre for Resource and Environmental Studies 
852 8 |b CARM  |h A2:AX00X0  |i X00000  |p 0044848  |f BK 
082 0 4 |a 338.09944/2 
999 f f |i 82f838a0-89ac-5e3c-92d4-f1b578322b2a  |s d3cc5982-b492-5b85-8f00-40b3eb9bd847 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e X00000  |f A2:AX00X0  |h Other scheme  |i book  |m 0044848