|
|
|
|
| LEADER |
01808nam a2200373 a 4500 |
| 001 |
c000169760 |
| 003 |
CARM |
| 005 |
19991011000000.0 |
| 008 |
830624s1983 nyua b 101 0 eng |
| 010 |
|
|
|a 83070399
|
| 019 |
1 |
|
|a 3029449
|5 LACONCORD2021
|
| 020 |
|
|
|a 0872623572
|
| 035 |
|
|
|a (OCoLC)9732278
|5 LACONCORD2021
|
| 040 |
|
|
|a DLC
|b eng
|c DLC
|d DLC
|d LC
|
| 050 |
0 |
0 |
|a TH435
|b .C726 1983
|
| 082 |
0 |
0 |
|a 690/.068/1
|2 19
|
| 082 |
0 |
4 |
|a 690/.068/1
|2 19
|
| 111 |
2 |
|
|a Conference on Current Practice in Cost Estimating and Cost Control,
|d (1983 :
|c Austin, Tex.)
|
| 245 |
1 |
0 |
|a Proceedings of the Conference on Current Practice in Cost Estimating and Cost Control /
|c sponsored by the Construction Division of the American Society of Civil Engineers in cooperation with the University of Texas at Austin, Austin, Texas, April 13-15, 1983 ; Victor F. Spruill and Calin Popescu, co-chairmen.
|
| 246 |
3 |
|
|a Current practice in cost estimating and cost control.
|
| 260 |
|
|
|a New York, N.Y. :
|b American Society of Civil Engineers,
|c c1983.
|
| 300 |
|
|
|a viii, 248 p. :
|b ill. ;
|c 22 cm.
|
| 500 |
|
|
|a Cover title: Current practice in cost estimating and cost control.
|
| 504 |
|
|
|a Includes bibliographical references and indexes.
|
| 650 |
|
0 |
|a Building
|x Estimates
|x Congresses.
|
| 650 |
|
0 |
|a Cost control
|x Congresses.
|
| 700 |
1 |
|
|a Spruill, Victor F.
|
| 700 |
1 |
|
|a Popescu, Calin.
|
| 710 |
2 |
|
|a University of Texas at Austin.
|
| 710 |
2 |
|
|a American Society of Civil Engineers.
|b Construction Division.
|
| 740 |
0 |
|
|a Current practice in cost estimating and cost control.
|
| 852 |
8 |
|
|b CARM
|h A2:AK05B0
|i B05280
|p 0235752
|f BK
|
| 999 |
f |
f |
|i 88addf33-4e08-5f37-abf3-c1db7a779018
|s 63a93e12-1de7-5384-aa14-451b16100627
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e B05280
|f A2:AK05B0
|h Other scheme
|i book
|m 0235752
|