Incentive plans : design & application considerations /

Saved in:
Bibliographic Details
Corporate Authors: University of Texas at Austin. Bureau of Engineering Research, Construction Industry Institute (Austin, Tex.) Contracts Task Force
Format: Book
Language:English
Published: Austin, Tex. : University of Texas, 1988.
Series:Publication (Construction Industry Institute (Austin, Tex.)) ; 5-2.
Subjects:
LEADER 01315nam a2200289 a 4500
001 c000170098
003 CARM
005 19960117000000.0
008 930326s1988 txu b 000 0 eng d
019 1 |a 9860737  |5 LACONCORD2021 
035 |a (OCoLC)221590726  |5 LACONCORD2021 
040 |a AINC  |b eng  |c AINC  |d ABN:SN 
245 0 0 |a Incentive plans :  |b design & application considerations /  |c prepared by The Construction Industry Institute Contracts Task Force. 
260 |a Austin, Tex. :  |b University of Texas,  |c 1988. 
300 |a 18 p. ;  |c 23 cm. 
490 1 |a Publication ;  |v 5-2. 
500 |a "November 1988" 
500 |a "Bureau of Engineering Research, University of Texas at Austin" -- cover. 
504 |a Bibliography: p. 15. 
650 0 |a Construction contracts. 
650 0 |a Construction industry  |x Production standards. 
710 2 |a University of Texas at Austin.  |b Bureau of Engineering Research. 
710 2 |a Construction Industry Institute (Austin, Tex.)  |b Contracts Task Force. 
830 0 |a Publication (Construction Industry Institute (Austin, Tex.)) ;  |v 5-2. 
852 8 |b CARM  |h A2:AK01B0  |i B05275  |p 0235786  |f BK 
999 f f |i 844d7f02-a298-592f-9375-217cd5687f63  |s 84fcd80f-8dbf-5d5b-98ca-a1a9ff5caf2d 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e B05275  |f A2:AK01B0  |h Other scheme  |i book  |m 0235786