|
|
|
|
| LEADER |
01492nam a2200289 a 4500 |
| 001 |
c000171548 |
| 003 |
CARM |
| 005 |
19961205000000.0 |
| 008 |
890501s1980 a a 000 0 eng d |
| 019 |
1 |
|
|a 4654979
|z 8124411
|5 LACONCORD2021
|
| 035 |
|
|
|a (OCoLC)219954851
|5 LACONCORD2021
|
| 040 |
|
|
|a NCLN
|b eng
|c NCLN
|d NSL:R
|
| 082 |
0 |
4 |
|a 551.489/099443
|
| 110 |
2 |
|
|a Soros-Longworth & McKenzie.
|
| 245 |
1 |
0 |
|a Bellinger Valley [flood plain management study]: :
|b [main report] /
|c Soros-Longworth & McKenzie, consulting engineers in association with Cameron McNamara, consultants.
|
| 260 |
|
|
|a [Sydney],
|c the Authors,
|c 1980.
|
| 300 |
|
|
|a 1v. (various pagings) :
|b ill. (some col.), charts (folded), maps (folded).
|
| 440 |
|
0 |
|a New South Wales coastal rivers flood plain management studies.
|
| 500 |
|
|
|a The study was supervised by a Steering Committee comprised of representatives from the N.S.W. Dept. of Public Works and other N.S.W. and Commonwealth Departments.
|
| 504 |
|
|
|a Includes bibligraphical references.
|
| 650 |
|
0 |
|a Flood control
|z New South Wales
|z Bellinger Valley .
|
| 650 |
|
0 |
|a Flood damage prevention
|z Australia
|z Bellinger Valley(N.S.W.)
|
| 710 |
2 |
|
|a Cameron McNamara Pty. Ltd.
|
| 710 |
1 |
|
|a New South Wales.
|b Dept. of Public Works.
|
| 852 |
8 |
|
|b CARM
|h A2:AR02D0
|i E01423
|p 0235270
|f BK
|
| 999 |
f |
f |
|i d444f8bc-0130-5ee5-8337-b12e84e65304
|s 6edd357c-7c21-5a5d-9a7f-25bdfe1d89ef
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e E01423
|f A2:AR02D0
|h Other scheme
|i book
|m 0235270
|