Sunbury : physical planning. Phase 1 final report /

Gorde:
Xehetasun bibliografikoak
Egile korporatiboa: Perrott, Lyon, Timlock & Kesa, Melton Sunbury Interim Co-ordinating Committee (Vic.)
Formatua: Liburua
Hizkuntza:English
Argitaratua: [s.l.] : Melton-Sunbury Interim Co-ordinating Committee, 1976.
Saila:[Reports] ; v.5
Gaiak:
LEADER 01126nam a2200265 a 4500
001 c000173308
003 CARM
005 20040322172535.0
008 830225s1976 vra a 000 0 eng d
019 1 |a 2546899  |5 LACONCORD2021 
035 |a (OCoLC)220159427  |5 LACONCORD2021 
040 |a VCAV  |b eng  |c VCAV  |d DBM:B 
042 |a anuc 
110 2 |a Perrott, Lyon, Timlock & Kesa. 
245 1 0 |a Sunbury :  |b physical planning. Phase 1 final report /  |c Perrott, Lyon, Timlock, Kesa & Associates Pty. Ltd. 
260 |a [s.l.] :  |b Melton-Sunbury Interim Co-ordinating Committee,  |c 1976. 
300 |a 91 p :  |b ill. ;  |c 30 cm. 
490 1 |a [Reports] ;  |v v.5 
504 |a Bibliography: p.81-82. 
650 0 |a Regional planning  |z Victoria  |z Sunbury. 
710 2 |a Melton Sunbury Interim Co-ordinating Committee (Vic.) 
810 2 |a Melton Sunbury Interim Co-ordinating Committee (Vic.)  |t [Reports] ;  |v v.5. 
852 8 |b CARM  |h A3:AD04C0  |i D06917  |p 0232568  |f BK 
999 f f |i 3de181b6-748b-520f-b733-83a2bb2ce42c  |s b5c421e6-e3aa-5213-8d06-2491b9fa8a30 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e D06917  |f A3:AD04C0  |h Other scheme  |i book  |m 0232568