|
|
|
|
| LEADER |
01343nam a2200313 a 4500 |
| 001 |
c000177897 |
| 003 |
CARM |
| 005 |
19971027000000.0 |
| 008 |
890502s1950 xnaab b s001 eng d |
| 019 |
1 |
|
|a 9887580
|5 LACONCORD2021
|
| 035 |
|
|
|a (OCoLC)221228369
|5 LACONCORD2021
|
| 040 |
|
|
|a NCLN
|b eng
|c NCLN
|d ABN-SNR
|
| 042 |
|
|
|a anuc
|
| 043 |
|
|
|a u-at-ne
|
| 082 |
0 |
4 |
|a 333.7/0994/44
|
| 245 |
0 |
4 |
|a The Namoi Region :
|b a preliminary survey of resources /
|c Division of Reconstruction and Development, Premier's Department.
|
| 260 |
|
|
|a Sydney :
|b The Dept.,
|c 1950.
|
| 300 |
|
|
|a 170 p. :
|b ill., maps ;
|c 34 cm. +
|e 7 maps in back pocket.
|
| 500 |
|
|
|a Includes index.
|
| 504 |
|
|
|a Bibliography: p.54-55.
|
| 650 |
|
0 |
|a Regional planning
|z New South Wales
|z Namoi River Region .
|
| 650 |
|
0 |
|a Land use
|x Planning
|z New South Wales
|z Namoi River Region .
|
| 650 |
|
0 |
|a Natural resources
|z New South Wales
|z Namoi River Region .
|
| 651 |
|
0 |
|a Namoi River Region (N.S.W.)
|
| 651 |
|
0 |
|a Namoi River Region (N.S.W.)
|x Economic conditions.
|
| 710 |
1 |
|
|a New South Wales.
|b Division of Reconstruction and Development.
|
| 852 |
8 |
|
|b CARM
|h A1:AR04E0
|i E01630
|p 0240632
|f BK
|
| 999 |
f |
f |
|i 42f40dab-e788-56f2-8c45-f51ae8700817
|s c73626a1-dfa9-5a23-be7c-da153ce9e847
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e E01630
|f A1:AR04E0
|h Other scheme
|i book
|m 0240632
|