LEADER 01343nam a2200313 a 4500
001 c000177897
003 CARM
005 19971027000000.0
008 890502s1950 xnaab b s001 eng d
019 1 |a 9887580  |5 LACONCORD2021 
035 |a (OCoLC)221228369  |5 LACONCORD2021 
040 |a NCLN  |b eng  |c NCLN  |d ABN-SNR 
042 |a anuc 
043 |a u-at-ne 
082 0 4 |a 333.7/0994/44 
245 0 4 |a The Namoi Region :  |b a preliminary survey of resources /  |c Division of Reconstruction and Development, Premier's Department. 
260 |a Sydney :  |b The Dept.,  |c 1950. 
300 |a 170 p. :  |b ill., maps ;  |c 34 cm. +  |e 7 maps in back pocket. 
500 |a Includes index. 
504 |a Bibliography: p.54-55. 
650 0 |a Regional planning  |z New South Wales  |z Namoi River Region . 
650 0 |a Land use  |x Planning  |z New South Wales  |z Namoi River Region . 
650 0 |a Natural resources  |z New South Wales  |z Namoi River Region . 
651 0 |a Namoi River Region (N.S.W.) 
651 0 |a Namoi River Region (N.S.W.)  |x Economic conditions. 
710 1 |a New South Wales.  |b Division of Reconstruction and Development. 
852 8 |b CARM  |h A1:AR04E0  |i E01630  |p 0240632  |f BK 
999 f f |i 42f40dab-e788-56f2-8c45-f51ae8700817  |s c73626a1-dfa9-5a23-be7c-da153ce9e847 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e E01630  |f A1:AR04E0  |h Other scheme  |i book  |m 0240632