Work routing, scheduling and dispatching in production /

Salvato in:
Dettagli Bibliografici
Autore principale: Younger, John
Altri autori: Geschelin, Joseph
Natura: Libro
Lingua:English
Pubblicazione: N.Y. : Ronald Pr., 1947.
Edizione:3rd ed.
Soggetti:
LEADER 00912cam a22002531a 4500
001 c000216745
003 CARM
005 19890529000000.0
008 851211s1947 nyu 0 eng d
019 1 |a 4186751  |z 25513254  |5 LACONCORD2021 
035 |a (OCoLC)831653  |5 LACONCORD2021 
040 |a NUN  |b eng  |c NUN  |d NU 
082 0 4 |a 658.51 
100 1 |a Younger, John. 
245 1 0 |a Work routing, scheduling and dispatching in production /  |c by J.Younger and J.Geschelin. 
250 |a 3rd ed. 
260 |a N.Y. :  |b Ronald Pr.,  |c 1947. 
300 |a x, 168 p. :  |b ill. ;  |c 24 cm. 
650 0 |a Factory management. 
650 0 |a Production management. 
700 1 |a Geschelin, Joseph. 
852 8 |b CARM  |h A2:AK32G0  |i C08068  |p 0254481  |f BK 
999 f f |i 900ccce5-0f58-549b-95d9-cef560b4cc2a  |s 3023af67-1d02-5f0f-8bc9-4bc4186bdcf3 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e C08068  |f A2:AK32G0  |h Other scheme  |i book  |m 0254481