Calibration of DISTFW parameters for the QDPI rainfall simulator : Newlands Mine /

Guardado en:
Detalles Bibliográficos
Autor Corporativo: University of Newcastle (N.S.W.). Dept. of Civil Engineering and Surveying
Otros Autores: Gyasi-Agyei, Y.
Formato: Libro
Lenguaje:English
Publicado: Callaghan, NSW : Dept. of Civil Engineering and Surveying, University of Newcastle, 1996.
Colección:Research report (University of Newcastle (N.S.W.). Dept. of Civil Engineering and Surveying) ; 130.2.1996.
Materias:
LEADER 01482nam a2200325 a 4500
001 c000225466
003 CARM
005 20061113101430.0
008 960422s1996 xna 000 0 eng d
019 1 |a 12230037  |5 LACONCORD2021 
020 |a 0725909242 
035 |a (OCoLC)38394853  |5 LACONCORD2021 
040 |a NU  |b eng  |c NU 
042 |a anuc 
082 0 4 |a 551.48 
245 0 0 |a Calibration of DISTFW parameters for the QDPI rainfall simulator :  |b Newlands Mine /  |c Y. Gyasi-Agyei ... [et al.]. 
260 |a Callaghan, NSW :  |b Dept. of Civil Engineering and Surveying, University of Newcastle,  |c 1996. 
300 |a 24 p. :  |b ill. ;  |c 21 cm. 
490 1 |a Research report / Department of Civil Engineering and Surveying, University of Newcastle ;  |v no. 130.2.1996 
504 |a Bibliography: p. 23-24. 
650 0 |a Runoff  |x Mathematical models. 
650 0 |a Rain and rainfall  |x Mathematical models. 
650 0 |a Hydrology  |x Mathematical models  |x Data processing. 
650 0 |a Hydrologic models. 
700 1 |a Gyasi-Agyei, Y. 
710 2 |a University of Newcastle (N.S.W.).  |b Dept. of Civil Engineering and Surveying. 
830 0 |a Research report (University of Newcastle (N.S.W.). Dept. of Civil Engineering and Surveying) ;  |v 130.2.1996. 
852 8 |b CARM  |h A2:AP37A0  |i B06734  |p 0317698  |f BK 
999 f f |i 085d83e9-0f25-5e81-8e08-7e325851be02  |s 7cee880f-b260-5c5b-9440-7f23b0539607 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e B06734  |f A2:AP37A0  |h Other scheme  |i book  |m 0317698