|
|
|
|
| LEADER |
01119cam a2200289 a 4500 |
| 001 |
c000229589 |
| 003 |
CARM |
| 005 |
20070220100251.0 |
| 008 |
881116s1989 enka 000 0 eng d |
| 015 |
|
|
|a b8865664
|
| 019 |
1 |
|
|a 6148903
|5 LACONCORD2021
|
| 020 |
|
|
|a 0947767983 (pbk.) :
|c £50.00 : CIP rev
|
| 035 |
|
|
|a (OCoLC)18881206
|5 LACONCORD2021
|
| 040 |
|
|
|a BNB
|b eng
|c BNB
|d ABN:1
|
| 050 |
0 |
0 |
|a T59.5
|
| 082 |
0 |
4 |
|a 670.42/7
|2 19
|
| 100 |
1 |
|
|a Owen, Tony.
|
| 245 |
1 |
0 |
|a Strategic issues in automated production :
|b the challenge of robotics and computer integrated manufacturing (an update) /
|c Tony Owen.
|
| 260 |
|
|
|a Cranfield :
|b Cranfield Press,
|c 1989.
|
| 300 |
|
|
|a 47 p. :
|b ill. ;
|c 30 cm.
|
| 500 |
|
|
|a Manufacturing industries. Automation (BNB/PRECIS)
|
| 650 |
|
0 |
|a Automation.
|
| 650 |
|
0 |
|a Computer integrated manufacturing systems.
|
| 650 |
|
0 |
|a Robots, Industrial.
|
| 852 |
8 |
|
|b CARM
|h A1:AP05C0
|i F01461
|p 0352570
|f BK
|
| 999 |
f |
f |
|i 4ebe1872-6f6b-5500-8f03-9f3a61019ef5
|s 7f4e78e1-c2f7-58b7-a2ec-e800cd900ae2
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e F01461
|f A1:AP05C0
|h Other scheme
|i book
|m 0352570
|