The determination of the force of digging during the excavation of overburden rock /

Đã lưu trong:
Chi tiết về thư mục
Tác giả chính: Tsarytsyn, V. V.
Định dạng: Sách
Ngôn ngữ:English
Russian
Được phát hành: Springfield, Va. : NTIS, 1972.
Loạt:PB ; 210 371-T
Những chủ đề:
LEADER 01196cam a2200277 a 4500
001 c000232929
003 CARM
005 20070418134509.0
008 920921s1972 vaua 000 0 eng d
019 1 |a 9289139  |5 LACONCORD2021 
035 |a (OCoLC)221401317  |5 LACONCORD2021 
040 |a VU  |b eng  |c VU  |d VCAV 
041 1 |a eng  |h rus 
100 1 |a Tsarytsyn, V. V. 
245 1 4 |a The determination of the force of digging during the excavation of overburden rock /  |c V.V. Tsaritsyn and V. Kutenetz ; translated by William R. Gill. 
260 |a Springfield, Va. :  |b NTIS,  |c 1972. 
300 |a 6 leaves :  |b ill. ;  |c 29 cm. 
440 0 |a PB ;  |v 210 371-T 
500 |a Translation of: Opredelenie usilii͡a kopanii͡a pri ekskavatsii vskryshnykh porod. 
534 |p Originally published in:  |a Mining, Construction and Highway Machines,  |c Vol. 9, pp. 27-31, 1970. 
546 |a Translated from the Russian. 
650 0 |a Excavating machinery. 
650 0 |a Excavation. 
852 8 |b CARM  |h A1:AP23E0  |i F01973  |p 0342746  |f BK 
999 f f |i 64576114-d24f-523e-8aa8-edecffb60ba1  |s 5ea7e85e-cfab-52eb-990a-3bae53f3cf6c 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e F01973  |f A1:AP23E0  |h Other scheme  |i book  |m 0342746