| LEADER | 01196cam a2200277 a 4500 | ||
|---|---|---|---|
| 001 | c000232929 | ||
| 003 | CARM | ||
| 005 | 20070418134509.0 | ||
| 008 | 920921s1972 vaua 000 0 eng d | ||
| 019 | 1 | |a 9289139 |5 LACONCORD2021 | |
| 035 | |a (OCoLC)221401317 |5 LACONCORD2021 | ||
| 040 | |a VU |b eng |c VU |d VCAV | ||
| 041 | 1 | |a eng |h rus | |
| 100 | 1 | |a Tsarytsyn, V. V. | |
| 245 | 1 | 4 | |a The determination of the force of digging during the excavation of overburden rock / |c V.V. Tsaritsyn and V. Kutenetz ; translated by William R. Gill. |
| 260 | |a Springfield, Va. : |b NTIS, |c 1972. | ||
| 300 | |a 6 leaves : |b ill. ; |c 29 cm. | ||
| 440 | 0 | |a PB ; |v 210 371-T | |
| 500 | |a Translation of: Opredelenie usilii͡a kopanii͡a pri ekskavatsii vskryshnykh porod. | ||
| 534 | |p Originally published in: |a Mining, Construction and Highway Machines, |c Vol. 9, pp. 27-31, 1970. | ||
| 546 | |a Translated from the Russian. | ||
| 650 | 0 | |a Excavating machinery. | |
| 650 | 0 | |a Excavation. | |
| 852 | 8 | |b CARM |h A1:AP23E0 |i F01973 |p 0342746 |f BK | |
| 999 | f | f | |i 64576114-d24f-523e-8aa8-edecffb60ba1 |s 5ea7e85e-cfab-52eb-990a-3bae53f3cf6c |
| 952 | f | f | |p Can circulate |a CAVAL |b CAVAL |c CAVAL |d CARM 1 Store |e F01973 |f A1:AP23E0 |h Other scheme |i book |m 0342746 |