|
|
|
|
| LEADER |
01538cam a2200349 a 4500 |
| 001 |
c000260205 |
| 003 |
CARM |
| 005 |
20070510155618.0 |
| 008 |
951201s1994 miuab b 000 0 eng d |
| 019 |
1 |
|
|a 12005095
|5 LACONCORD2021
|
| 035 |
|
|
|a (OCoLC)226177343
|5 LACONCORD2021
|
| 040 |
|
|
|a VU
|b eng
|c VU
|d VCAV
|
| 100 |
1 |
|
|a Bottin, Robert R.
|
| 245 |
1 |
0 |
|a Wave conditions for Pier 400 dredging and landfill project, Los Angeles Outer Harbor, Los Angeles, California /
|c by Robert R. Bottin, Hugh F. Acuff.
|
| 260 |
|
|
|a Vicksburg, Miss. :
|b U.S. Army Corps of Engineers, Waterways Experiment Station,
|c 1994.
|
| 300 |
|
|
|a vii, 20, [48] p. :
|b ill., maps ;
|c 28 cm.
|
| 440 |
|
0 |
|a Technical report CERC ;
|v 94-8
|
| 500 |
|
|
|a Prepared for Port of Los Angeles, Harbor Department"--t.p.
|
| 500 |
|
|
|a "May 1994".
|
| 504 |
|
|
|a Includes bibliographical references (p. 19-20)
|
| 513 |
|
|
|a Final report.
|
| 650 |
|
0 |
|a Spoil banks
|x Environmental aspects.
|
| 650 |
|
0 |
|a Harbors
|z California
|x Hydrodynamics
|x Models.
|
| 650 |
|
0 |
|a Dredging spoil
|z California
|z Los Angeles.
|
| 650 |
|
0 |
|a Hydraulic models.
|
| 700 |
1 |
|
|a Acuff, Hugh F.
|
| 710 |
1 |
|
|a Los Angeles (Calif.).
|b Harbor Dept.
|
| 710 |
2 |
|
|a Coastal Engineering Research Center (U.S.)
|
| 710 |
2 |
|
|a U.S. Army Engineer Waterways Experiment Station.
|
| 852 |
8 |
|
|b CARM
|h A1:AP30C0
|i F02075
|p 0342405
|f BK
|
| 999 |
f |
f |
|i 1dc5d5cb-0e63-5741-93a2-91e5d1926c09
|s 2ac2966b-8fd5-5737-9c8e-445d750d42aa
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e F02075
|f A1:AP30C0
|h Other scheme
|i book
|m 0342405
|