|
|
|
|
| LEADER |
01142cam a2200289 a 4500 |
| 001 |
c000290865 |
| 003 |
CARM |
| 005 |
20090225155206.0 |
| 008 |
860321s1987 waua b 001 0 eng d |
| 019 |
1 |
|
|a 4515362
|5 LACONCORD2021
|
| 020 |
|
|
|a 089116345X (Hemisphere) :
|c $22.50 (est.)
|
| 020 |
|
|
|a 3540170847 (Springer)
|
| 035 |
|
|
|a (OCoLC)13424678
|5 LACONCORD2021
|
| 040 |
|
|
|a LC
|b eng
|c LC
|d VCAV
|
| 050 |
0 |
0 |
|a TS176
|b .K63 1987
|
| 082 |
0 |
4 |
|a 670.42
|2 19
|
| 100 |
1 |
|
|a Koenig, Daniel T.
|
| 245 |
1 |
0 |
|a Manufacturing engineering :
|b principles for optimization /
|c Daniel T. Koenig.
|
| 260 |
|
|
|a Washington :
|b Hemisphere Pub. Corp. ;
|a Berlin ;
|a New York :
|b Distribution outside North America, Springer-Verlag,
|c c1987.
|
| 300 |
|
|
|a xii, 348 p. :
|b ill. ;
|c 25 cm.
|
| 500 |
|
|
|a Includes index.
|
| 504 |
|
|
|a Bibliography: p. 341-342.
|
| 650 |
|
0 |
|a Production engineering.
|
| 650 |
|
0 |
|a Factory management.
|
| 852 |
8 |
|
|b CARM
|h A3:AB07G0
|i C11739
|p 0524534
|f BK
|
| 999 |
f |
f |
|i 8ecf3148-03dc-5330-b9f4-62b6034ef0f2
|s 1a41cac4-9297-5c4f-9d88-e55d0b7b07e0
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e C11739
|f A3:AB07G0
|h Other scheme
|i book
|m 0524534
|