|
|
|
|
| LEADER |
01264nam a2200277 a 4500 |
| 001 |
c000300989 |
| 003 |
CARM |
| 005 |
20061111052446.0 |
| 008 |
950911s1979 enka b f000 0 eng d |
| 019 |
1 |
|
|a 3598991
|5 LACONCORD2021
|
| 035 |
|
|
|a (OCoLC)5713545
|5 LACONCORD2021
|
| 082 |
0 |
4 |
|a 625.8
|2 19
|
| 100 |
1 |
|
|a Czarnecki, I. H.
|
| 245 |
1 |
0 |
|a Mixing and laying trials of bituminous materials produced by the Wibau-SL process /
|c by I.H. Czarnecki and G.D. Goodsall.
|
| 260 |
|
|
|a Crowthorne, Berkshire :
|b Construction and Maintenance Division, Highways Dept., Transport and Road Research Laboratory,
|c 1979.
|
| 300 |
|
|
|a 60, [15] p. :
|b ill ;
|c 30 cm.
|
| 490 |
0 |
|
|a TRRL laboratory report,
|x 0305-1293 ;
|v 897
|
| 504 |
|
|
|a Includes bibliographical references.
|
| 650 |
|
0 |
|a Bituminous materials.
|
| 650 |
|
0 |
|a Road materials.
|
| 700 |
1 |
0 |
|a Goodsall, G. D.
|
| 710 |
2 |
|
|a Transport and Road Research Laboratory (Great Britain).
|b Highways Dept..
|b Construction and Maintenance Division.
|
| 830 |
|
0 |
|a TRRL laboratory report ;
|v 897.
|
| 852 |
8 |
|
|b CARM
|h A3:AF01D0
|i F07420
|p 0548182
|f BK
|
| 999 |
f |
f |
|i a96fea6a-22b8-585e-8647-daf4803a14ce
|s bffd688a-772b-5662-a3be-2e20547b63eb
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|e F07420
|f A3:AF01D0
|h Other scheme
|i book
|m 0548182
|