LEADER 01420nam a2200313 a 4500
001 c000300997
003 CARM
005 20061111052449.0
008 950911s1979 enka b f000 0 eng d
019 1 |a 3588792  |5 LACONCORD2021 
035 |a (OCoLC)79641037  |5 LACONCORD2021 
043 |a e-uk--- 
082 0 4 |a 625.7  |2 19 
100 1 |a Davies, H. E. H. 
245 1 0 |a Horizontal alignment optimisation :  |b test of program NOAH on a motorway scheme /  |c by H.E.H. Davies and J. Broughton. 
260 |a Crowthorne, Berkshire :  |b Access and Mobility Division, Transport Operations Dept., Transport and Road Research Laboratory,  |c 1979. 
300 |a 31 p. :  |b ill ;  |c 30 cm. 
490 0 |a TRRL laboratory report,  |x 0305-1293 ;  |v 894 
504 |a Includes bibliographical references. 
650 0 |a Express highways  |z Great Britain. 
650 0 |a Highway engineering  |x Data processing. 
650 0 |a NOAH (Computer program) 
650 0 |a Roads  |x Design and construction  |x Data processing. 
700 1 0 |a Broughton, J. 
710 2 |a Transport and Road Research Laboratory (Great Britain).  |b Transport Operations Dept..  |b Access and Mobility Division. 
830 0 |a TRRL laboratory report ;  |v 894. 
852 8 |b CARM  |h A3:AF01D0  |i F07420  |p 0548202  |f BK 
999 f f |i 16ba5674-4265-5c89-b370-764ab7ceba95  |s 0705bcdc-c75f-55dd-9ec9-3d04ed3f3b4f 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |e F07420  |f A3:AF01D0  |h Other scheme  |i book  |m 0548202