| LEADER | 00798nam a22002051 4500 | ||
|---|---|---|---|
| 001 | c000359283 | ||
| 003 | CARM | ||
| 005 | 00000000000000.0 | ||
| 008 | 851029s1965 wau 00000 eng d | ||
| 019 | 1 | |a 4066867 |5 LACONCORD2021 | |
| 035 | |a (OCoLC)217181251 |5 LACONCORD2021 | ||
| 100 | 1 | |a Novick, David. | |
| 245 | 1 | 0 | |a Program budgeting / |c program analysis and the Federal budget. Ed. by D.Novick. |
| 260 | |a Wash. : |b Govt. Pr., |c 1965. | ||
| 500 | |a A Rand Corporation-sponsored research study. | ||
| 650 | 0 | |a Program budgeting |z United States. | |
| 852 | 8 | |b CARM |h A1:AL20C0 |i B10100 |p 0449301 |f BK | |
| 082 | 0 | 4 | |a 353.00722 |
| 999 | f | f | |i 658c0c31-5482-53af-854b-a850514280ad |s b1ae76e2-4d06-590e-b600-5bdee51e03a6 |
| 952 | f | f | |p Can circulate |a CAVAL |b CAVAL |c CAVAL |d CARM 1 Store |e B10100 |f A1:AL20C0 |h Other scheme |i book |m 0449301 |