|
|
|
|
| LEADER |
01567cam a2200361 a 4500 |
| 001 |
c000388187 |
| 003 |
CARM |
| 005 |
20111117122935.0 |
| 008 |
111117s1990 coua b 000 0 eng d |
| 010 |
|
|
|a 91144776
|
| 019 |
1 |
|
|a 22023098
|5 LACONCORD2021
|
| 020 |
|
|
|a 0898675553 (pbk.)
|
| 035 |
|
|
|a (OCoLC)24431482
|5 LACONCORD2021
|
| 040 |
|
|
|a QGU
|b eng
|d QGU
|
| 050 |
|
4 |
|a TD491
|b .L43 1990
|
| 082 |
0 |
4 |
|a 363.6/1
|2 20
|
| 245 |
0 |
0 |
|a Lead service line replacement :
|b a benefit-to-cost analysis /
|c prepared by Roy F. Weston, Inc. and Economic and Engineering Services, Inc. ; prepared for: the American Water Works Association ; sponsored by the Water Technical Action Fund.
|
| 260 |
|
|
|a Denver, CO :
|b The Assocation,
|c c1990.
|
| 300 |
|
|
|a 1 v. (various pagings) :
|b ill. ;
|c 28 cm.
|
| 500 |
|
|
|a "Final report"--Cover.
|
| 500 |
|
|
|a Spine title: Final report: lead service line replacement.
|
| 504 |
|
|
|a Includes bibliographical references.
|
| 650 |
|
0 |
|a Water-pipes
|x Maintenance and repair
|x Cost effectiveness.
|
| 650 |
|
0 |
|a Pipe, Lead.
|
| 710 |
2 |
|
|a American Water Works Association.
|
| 710 |
2 |
|
|a Economic and Engineering Services, Inc.
|
| 710 |
2 |
|
|a Roy F. Weston, Inc
|
| 740 |
0 |
|
|a Final report: Lead service line replacement.
|
| 852 |
8 |
|
|b CARM
|p 0462962
|f BK
|
| 852 |
8 |
|
|b SCAN
|h A3:AG32E0
|i F08374
|p 0462962
|f BK
|
| 999 |
f |
f |
|i 2aaa56f3-18a5-57fb-8246-7839211bc4ef
|s 31142cbf-2de9-5125-8c97-2e7d2e5644e8
|
| 952 |
f |
f |
|p Can circulate
|a CAVAL
|b CAVAL
|c CAVAL
|d CARM 1 Store
|i book
|m 0462962
|
| 952 |
f |
f |
|a CAVAL
|b CAVAL
|c CAVAL
|d Unmapped Location
|e F08374
|f A3:AG32E0
|h Other scheme
|