Development of quality control procedures for road building materials and road construction practices : the use of the road roughness meter for evaluation of surface finish after compaction, interim report, no.1: methods of measurements, roughness after compaction, effect of sealing /
Bewaard in:
| Andere auteurs: | |
|---|---|
| Formaat: | Boek |
| Taal: | English |
| Gepubliceerd in: |
[Perth] :
Main Roads Dept.,
1975.
|
| Reeks: | Australian transport (planning & research) act: project W.A ;
8/74 Report ; no.75/29 |
| Onderwerpen: |
| LEADER | 01696cam a2200349 a 4500 | ||
|---|---|---|---|
| 001 | c000391128 | ||
| 003 | CARM | ||
| 005 | 20120806133816.0 | ||
| 008 | 120806s1975 weaa b s000 0 eng d | ||
| 019 | 1 | |a 1640990 |5 LACONCORD2021 | |
| 020 | |a 0724460594 |c unpriced | ||
| 035 | |a (OCoLC)27528740 |5 LACONCORD2021 | ||
| 040 | |a ANB |b eng |c ANB |d WLB | ||
| 042 | |a anuc | ||
| 043 | |a u-at-we | ||
| 082 | 0 | 4 | |a 625.8099411 |
| 245 | 0 | 0 | |a Development of quality control procedures for road building materials and road construction practices : |b the use of the road roughness meter for evaluation of surface finish after compaction, interim report, no.1: methods of measurements, roughness after compaction, effect of sealing / |c [by] G. Hamory. |
| 246 | 3 | |a Use of the road roughness meter for evaluation of surface finish after compaction | |
| 246 | 3 | |a Methods of measurements, roughness after compaction, effect of sealing | |
| 260 | |a [Perth] : |b Main Roads Dept., |c 1975. | ||
| 300 | |a 9 leaves : |b graphs ; |c 30 cm. | ||
| 490 | 0 | |a Australian transport (planning & research) act: project W.A ; |v 8/74 | |
| 490 | 1 | |a Report ; |v no.75/29 | |
| 504 | |a Bibliography: leaf 9. | ||
| 650 | 0 | |a Roads |x Riding qualities |x Testing |z Perth (W.A.). | |
| 700 | 1 | |a Hamory, G. |q (Gabor Ivan) | |
| 852 | 8 | |b CARM |p 0581807 |f BK | |
| 852 | 8 | |b SCAN |h A3:AG26C0 |i F08308 |p 0581807 |f BK | |
| 810 | 1 | |a Western Australia. |b Main Roads Dept. |b Materials Engineering Division. |t Report ; |v no.75/29. | |
| 999 | f | f | |i be4a5ab1-7d97-5b6c-987d-b21bbd6aa635 |s f7a5d784-1e11-540e-9ca8-fffec68e3bb3 |
| 952 | f | f | |p Can circulate |a CAVAL |b CAVAL |c CAVAL |d CARM 1 Store |i book |m 0581807 |
| 952 | f | f | |a CAVAL |b CAVAL |c CAVAL |d Unmapped Location |e F08308 |f A3:AG26C0 |h Other scheme |