LEADER 01422cam a2200325 a 4500
001 c000397405
003 CARM
005 20140606152932.0
008 140606s1994 vraa b 000 0 eng d
019 1 |a 11502713  |5 LACONCORD2021 
035 |a (OCoLC)221440862  |5 LACONCORD2021 
040 |a QCQU  |b eng  |c QCQU 
042 |a anuc 
082 0 4 |a 669.722  |2 20 
100 1 |a Nicholls, Miles G. 
245 1 0 |a Integrated production process modelling involving multiple time horizons /  |c by Miles G. Nicholls. 
260 |a [Melbourne] :  |b Centre for Information Systems Research, Swinburne University of Technology,  |c 1994. 
300 |a 22 leaves :  |b ill. ;  |c 30 cm. 
490 1 |a Working paper ;  |v 94-5 
504 |a Includes bibliographical references (leaf 22). 
610 2 0 |a Portland Aluminium Smelter. 
650 0 |a Aluminum plants. 
650 0 |a Manufacturing processes  |x Mathematical models. 
710 2 |a Swinburne University of Technology.  |b Centre for Information Systems Research. 
852 8 |b CARM  |p 0603496  |f BK 
852 8 |b SCAN  |h A3:AH08C0  |i F08861  |p 0603496  |f BK 
830 0 |a Working paper (Swinburne University of Technology. Centre for Information Systems Research) ;  |v 94-5. 
999 f f |i 7f391aa7-60e9-5edb-a1c1-ed742baa9bad  |s 652a66c9-294e-5dd8-87e5-4a4d261fca3b 
952 f f |p Can circulate  |a CAVAL  |b CAVAL  |c CAVAL  |d CARM 1 Store  |i book  |m 0603496 
952 f f |a CAVAL  |b CAVAL  |c CAVAL  |d Unmapped Location  |e F08861  |f A3:AH08C0  |h Other scheme