|
|
|
|
| LEADER |
01112nam a2200289 a 4500 |
| 001 |
c000417034 |
| 003 |
CARM |
| 005 |
00000000000000.0 |
| 008 |
931216s1994 nyua b 00100 eng |
| 010 |
|
|
|a 93049427 //r962
|
| 019 |
1 |
|
|a 10679784
|
| 020 |
|
|
|a 0815316720 (acid-free paper)
|
| 035 |
|
|
|a (OCoLC)29598286
|
| 035 |
|
|
|a (vdu).b16742679
|
| 040 |
|
|
|a VDU
|c VDU
|
| 050 |
0 |
0 |
|a TS157.5
|b .R36 1994
|
| 082 |
0 |
4 |
|a 658.53
|2 20
|
| 100 |
1 |
|
|a Raman, Narayan.
|
| 245 |
1 |
0 |
|a Real-time scheduling problems in a general flexible manufacturing system /
|c Narayan Raman.
|
| 260 |
|
|
|a New York :
|b Garland Pub.,
|c 1994.
|
| 300 |
|
|
|a ix, 121 p. :
|b ill. ;
|c 24 cm.
|
| 490 |
0 |
|
|a Garland studies on industrial productivity.
|
| 505 |
0 |
|
|a 1. Introduction -- 2. The Workcenter Scheduling Problem -- 3. The Multiple-Machine Tardiness Problem -- 4. The Shop Scheduling Problem.
|
| 504 |
|
|
|a Includes bibliographical references (p. 107-115) and index.
|
| 650 |
|
0 |
|a Production scheduling.
|
| 650 |
|
0 |
|a Flexible manufacturing systems
|x Management.
|
| 999 |
f |
f |
|i 77ec1347-d288-522e-b77f-96f924d3b8ff
|s b2c6fd58-4daa-54ff-a72e-b1389d633c1e
|